In a brief

For our client a national power generation company, we were asked to conduct a codification project covering their seven powerplants.

The original scope was estimated to aprx. 10,000 hrs, but after an initial review we advised the client to conduct a pilot project in order to establish the correct method and value proposition.

Based on Our work with the client and in their systems, we succeeded in re-scoping the project and reducing the overall estimate for the project with +50%.

Deliverables

The physical deliverables for this project can be summarized to

  • Master data in SAP for six material groups in one power plant.
  • Full photo documentation for all MN’s in the groups.
  • Development of an upload tool for masse upload in SAP MM.
  • Development of a link building tool from MN master to documentation system.
  • Report for project scoping of the full project.

But the strongest deliverable has been the advisory to the client which in turns helped assisting them in saving cost and ending up with a sustainable solution.

Value

  • Clear scope definition.
  • Reduction of cost from original scope with over 50%.
  • A sustainable solution.